2026-09-17
A battery energy storage system (BESS) integrator in Southeast Asia turned to us for a reliable thermal interface material to keep its containerized storage systems operating safely and efficiently in one of the world’s hottest, most humid regions.
The integrator designs and deploys containerized energy storage systems for utilities, industrial parks, and commercial buildings across Indonesia, Malaysia, and the Philippines. Its products rely on liquid-cooled cold plates and battery modules that must deliver consistent output day after day in ambient temperatures that regularly exceed 35°C. As projects scaled up, the company needed a thermal interface material that would stay reliable for the full life of the system.
We supplied a thermally conductive silicone gap filler formulated for battery modules and power electronics in energy storage systems. Its soft, highly conformable nature fills uneven surfaces and eliminates air gaps, creating a stable thermal path from battery cells to cooling plates.
| Property | Specification | Customer Benefit |
|---|---|---|
| Thermal conductivity | 3.0 W/m·K | Fast, uniform heat removal |
| Consistency | Soft, non-curing gel | Resists pump-out and dry-out |
| Operating range | -50°C to 180°C | Reliable in tropical climates |
| Dielectric strength | >15 kV/mm | Safe electrical insulation |
| UL rating | UL94 V-0 | Enhanced fire safety |
| Application | Dispensing / gap filling | Adaptable to automated lines |
Energy storage is expanding rapidly across Southeast Asia to support renewable integration, peak shaving, and grid stability. Because tropical heat accelerates degradation, reliable thermal management is central to safety, performance, and return on investment. Our thermal conductive silicone delivers the durability and efficiency BESS integrators need to build storage systems that perform dependably in the harshest operating conditions.
“The gap filler gave us a stable thermal path we could rely on. Our modules now run cooler and more evenly, and we have standardized it across our commercial storage line," said the client’s engineering lead.